THB

How do we set out traffic management dependent on requirements

How do we set out traffic management dependent on requirements

THB offers comprehensive traffic management services approved by the National Highways Sector Scheme. It ensures we uphold the strict UK and local legal requirements for managing traffic while construction work takes place on road sites.

Here is a breakdown of the steps involved in the traffic management process:

1) Early Consultation with the Contractors

Our highly trained and experienced traffic managers will consult with your contractors and worksite team about the available options for managing on-site traffic.

We’ll take photographs of the site and gather any other important documentation necessary to prepare for the job.

 

2) Design CAD Drawings of the Site

Our advanced CAD technicians will create custom CAD drawings of the site based on the photographic and documentary evidence gathered.

The CAD drawings will help us visualize the potential traffic management system that will get put in place.

 

3) Create a Plan

Our project administrators will work with local authorities to gather the permits needed so that you can legally conduct your worksite project.

A traffic management plan will get established and approved by the local authorities.

 

4) Implement the Plan

The final step is to implement the plan. Our team of site operatives will go out to your worksite location and perform the traffic management service lawfully and safely.

We’ll make sure everything stays within the confines of the law. That way, you won’t receive any fines or penalties from the local or national government.

 

Contact Us

Do you need THB to provide traffic management services based on specific legal requirements? Call us at 0800 0146 420 for more information.

Scroll to Top

Download Brochure

Enter your email address below