Background

THB were contracted to install new asphalt surfacing in a part hand-lay and part machine-lay. We installed a base, binder and surface course, an inverted camber for drainage in the central reservation and a new vehicular crossover surface. We also installed a new concrete sub-base alongside a precast surface water channel.


Planing

We utilised our 1.0m planer to install step detail tie-ins for the new asphalt [165tn total]. We swept and cleaned the surfaces with our sweepers, ready for the new asphalt to be laid.


Surfacing

Using our 800 and 1303 pavers, we laid 1189tn of asphalt, which consisted of an inverted camber drainage channel, new vehicle crossover and surface water channel tie-in.


Concrete

We installed 65m3 of c8/c10 concrete to tie into the new precast drainage channel. The project was completed in one day, and crack inducers were installed every 3m.


Before & After

Before National Highway Before
After National Highway After

Objectives

  • Provide a cost-effective method of maintenance
  • Implement a preventative structure for a long-term solution
  • Resolve future drainage issues
  • Install a reliable concrete sub-base & precast water channel
  • Install brand-new vehicular crossover surface
  • Install base, binder and surface course

Challenges

  • Short notice for mobilisation
  • Changing scope of works mid-project
  • Complex working environment
  • Complex machine lay with inverted camber
  • Multi-discipline requirements across one shift

Outcome

Project Successfully Delivered

We completed extensive surfacing and drainage work, resolved all issues, implemented preventative methods and provided a long-term solution, enhancing the road’s durability and safety. We finished the job within the estimated time under a strict work programme.

Project Details

Client
National Highways
Location
M2 Motorway, Kent
Duration
1 Day
Sector
Infrastructure / Highways
Services Used
Planing Surfacing Concrete Drainage
Have a Similar Project?

Talk to our team about how we can deliver the right solution for you.

Get In Touch

Why Choose THB?

24/7 Callout Service

Safe Contractor Approved

Award Winning

BBA Approved Installer

Construction Line Gold Member

Part Of The National Highways Schemes

UKAS Management Systems

Environmentally Aware

Get In Touch

For a quick response simply fill out our form. A member of our friendly team will get straight back to you.

This field is for validation purposes and should be left unchanged.

Our Accreditations, Certifications & Registrations